Project Registry Form

Project Registry Form

1. System Components

1.a) System installed as per approved or amended drawing/s(Required)
1.b) Conducted proof load testing of 6kN on cable terminations(Required)
1.c) Conducted proof load test on anchor post/s(Required)
1.d) Shock absorber/s installed properly and not deployed(Required)
1.e) Acquired proper tensioning(Required)
1.f) Brackets and posts installed properly as per manufacturer’s instructions and guidelines(Required)
1.g) Brackets and posts’ torque set to the specified value(Required)
1.h) No damage (dent, cut, crack, deformation, etc.)(Required)
1.i) No rust and other contaminants(Required)
1.j) Presence of identification plate and warning notices(Required)

2. Wire Rope/Rails

2.a) Wire rope correctly fitted and passes smoothly through corners and/or intermediates(Required)
2.b) Rails allow smooth passage of trolley(Required)
2.c) Allows entry and exit of traveler/trolleys(Required)
2.d) No sag of wire rope/ No displacement of rails(Required)
2.e) No damage (dent, cut, crack, deformation, etc.)(Required)

3. Fasteners/Junctions/Fixations

3.a) Properly secured(Required)
3.b) Torque set to the specified value M8: 30 N-m M10: 45 N-m M12: 50 N-m M16: 70 N-m(Required)
3.c) Conducted pull-out test (for concrete substructure)(Required)
3.d) No damage (dent, cut, crack, deformation, etc.)(Required)

4. Traveler/Trolley

4.a) Easy movement, pass smoothly through the wire rope/rail(Required)
4.b) Functions properly and with correct markings/labels(Required)